Skip to main content

Microtec

Sales Rep Cost per Visit and Minimum Order Calculator

Enter what the rep and the van cost each month and how many calls they make, and see the smallest order worth the trip.

The rep costs the company SAR a month in salary, allowances and GOSI, and the van SAR with fuel and maintenance.

The rep works days a month and visits outlets a day; % of visits end in an order, and the gross margin is % of the selling price.

    The figures shown are an example for a city van rep; replace them with your own.

    Minimum order value to make a profit

    —of visits end in an order
    —

    Cost per visit
    —
    Cost per order
    —
    Break-even sales per month
    —
    Outlets the route can cover
    —
    How was this calculated?

    Cost per visit is what the company spends on a field sales rep and their van in a month, divided by the number of calls they make. Fill in the sentence above with the all-in salary, the van cost, working days, daily visits, the share of visits that end in an order and your margin, and the calculator returns what each call costs, what each order costs, and the smallest order whose margin pays for the trip. It is set up for distributors in Saudi Arabia: amounts in SAR, figures from your own books, and an example rep working 26 days a month.

    Short answerEach visit costs the monthly cost ÷ visits. Minimum order = cost per order ÷ gross margin, where cost per order = monthly cost ÷ orders. Any order below that line is sold at a loss, however healthy the margin looks.

    How to calculate cost per visit and the minimum order

    Add up what the rep and the van cost in a month and divide by visits (working days × daily visits). Calls that end without an order still cost money, so the same monthly cost divided by orders alone gives the cost per order. An order pays for itself when its margin equals that cost, so divide the cost per order by the margin percentage.

    Per visit = Monthly cost ÷ (Days × Visits/day) · Min order = Cost per order ÷ Margin %

    Example 1: a rep costing SAR 8,500 with a van at SAR 4,500 works 26 days and makes 20 calls a day; half of them end in an order and the margin is 10%. That is 520 visits, so each visit costs 13,000 ÷ 520 = 25.00. Orders come to 260, the cost per order is SAR 50.00, and the minimum order is 50 ÷ 10% = 500.00.
    Example 2, lower strike rate: the same figures, but only 40% of visits end in an order. Orders drop to 208, the cost per order rises to SAR 62.50 and the minimum order to SAR 625.00.
    Example 3, with commission: the figures from example 1, plus a 3% sales commission for the rep. The company keeps a 7% margin, so the minimum order is 50 ÷ 7% = 714.29 and break-even sales are SAR 185,714.29 a month.

    What goes into a sales rep's monthly cost

    A rep's cost is everything the company pays because that person is in the field, not the basic salary alone: allowances, any fixed incentive, the employer's GOSI share, medical insurance, iqama and work permit fees for a non-Saudi rep spread over twelve months, and the phone bill. The van adds the lease or instalment, fuel, maintenance and tyres, and insurance and annual fees spread over the months. Switch on the cost breakdown to enter each item separately; the calculator adds them into the sentence.

    Together these are the direct cost to serve the route. Warehouse costs and management salaries stay out, because the question is what this rep's orders have to cover by themselves.

    Strike rate and why it moves the minimum order

    Strike rate is the number of visits that ended in an order divided by all visits. When it slips from 50% to 40%, the minimum order climbs from SAR 500 to SAR 625 without any change in salary or fuel, as example 2 shows. Review it for each rep every month and look at the outlets that get visited and do not buy: do they need a weekly call, or would a phone order do?

    How many outlets a sales route needs

    Outlets on the route = visits per month ÷ visits per outlet. With 520 visits and a weekly call (4 a month) the route covers 130 outlets; with a call every other week it covers 260. Fewer outlets than that means the rep has spare hours; more means some outlets miss their visit day.

    Comparing two van sales routes

    A van sales rep in the city makes more calls with smaller drop sizes; on the outskirts they make fewer calls with bigger orders and burn more fuel. Switch on the route comparison and enter the second route's figures to see the minimum order and the margin left on each, which is the route profitability that matters.

    Example 4: route 1 uses the figures from example 1 with an average order of SAR 650 and leaves SAR 3,900.00 after costs. Route 2 has 12 visits a day, 75% of them with an order, an average order of SAR 900 and SAR 600 more fuel. Each of its visits costs SAR 43.59, its minimum order SAR 581.20, and it leaves SAR 7,460.00, which is SAR 3,560.00 more than route 1 even though each visit costs more. Load it with the button "Example: city route versus outskirts route".

    Break-even sales for a rep each month

    Break-even sales are the sales whose margin exactly covers the rep and van costs: monthly cost ÷ margin. At SAR 13,000 of costs and a 10% margin, the rep has to sell SAR 130,000 a month before the route earns a single riyal. Compare that figure with the monthly target; a target below it means the route loses money even when it is met.

    Common mistakes when costing a sales rep

    • Costing the rep at basic salary only and leaving out allowances, GOSI and the van.
    • Dividing by orders when you want the cost of a visit, or by visits when you want the cost of an order.
    • Using markup on cost instead of margin on the selling price, which makes the minimum order look smaller than it is.
    • Forgetting variable commission, which comes straight off the margin that covers the costs.
    • Setting one minimum order for every route when remote routes cost more per call.

    What to do with the result

    Turn the minimum order into a written policy that reps and customers both know, or tie it to free delivery. Move outlets that order below it to a fortnightly call or phone ordering, and run the numbers again after every route change. Download the result as a PDF for the sales meeting, or as an Excel file with live formulas to test other scenarios. To see how the commission rate changes the rep's own pay, use the sales commission calculator.

    When dozens of calls a day are run from a notebook

    Working out the minimum order once is easy; tracking it every day for every rep and outlet is the hard part: who called and sold nothing, who sold under the line, and what is left on the van. At Microtec we offer O-Orange, a system for field sales and distribution, to distributors running routes across Saudi Arabia. Try it before you decide.

    Frequently asked questions

    How do I calculate the cost per sales call?

    Add up the rep's and the van's monthly costs and divide by the number of visits. A rep and van costing SAR 13,000 who make 20 calls a day over 26 days cost SAR 25 per visit.

    How do I set a minimum order value?

    Divide the cost per order by the gross margin. With a cost per order of SAR 50 and a 10% margin, the minimum order is SAR 500; any smaller order has a margin that does not pay for reaching the customer.

    How much does a field sales rep cost per month in Saudi Arabia?

    There is no single figure. It depends on salary, allowances and commission, whether the van is owned or leased, GOSI, and fees for a non-Saudi rep. Enter your own items in the cost breakdown to get your real number.

    What is the difference between cost per visit and cost per order?

    Cost per visit spreads the month's costs over every call; cost per order spreads them over the calls that ended in an order. At a 50% strike rate, the cost per order is twice the cost per visit.

    Should the minimum order be before or after VAT?

    Before VAT, because the tax is collected for ZATCA and is not part of your margin. If your invoices show VAT-inclusive prices, divide them by 1.15 before comparing them with the minimum order.

    ↑