Skip to main content

Microtec

Reorder Point Calculator, with Safety Stock and EOQ

When to order, how much buffer to keep, and how much to order each time, from your item's numbers and costs.

units
days
units
units
Reorder point
— units

How was this calculated?

The reorder point is the stock level at which you place a new order so the goods arrive before the shelf runs empty. This reorder point calculator sits alongside two linked tools: safety stock, which protects you from swings in sales and late suppliers, and economic order quantity, which sets the size of each order. Whatever you type in one tab carries into the other two, and the chart traces the stock level with your numbers. The examples follow a store and a restaurant in Saudi Arabia, with costs in riyals.

Short answerReorder point = daily usage × lead time + safety stock. Economic order quantity = the square root of (2 × annual demand × cost per order ÷ holding cost per unit per year).

How to calculate the reorder point

Multiply how much of the item goes out each day by the number of days between placing an order and the goods reaching the warehouse, then add safety stock. The result rounds up to a whole unit, because half a carton does not prevent a stock-out.

ROP = d × L + SS

Example, a retail store: the store sells 40 cartons of water a day, the supplier delivers in 5 days, and safety stock is 60 cartons. The reorder point is 40 × 5 + 60 = 260 cartons: when stock reaches 260, the order goes out.
Example, a restaurant: the kitchen uses 25 kg of tomatoes a day, the supplier delivers two days later, and safety stock is 10 kg. The reorder point is 25 × 2 + 10 = 60 kg. With perishables, safety stock stays small, because anything extra ends up in the bin.

How to calculate safety stock

Safety stock is a quantity held back to cover a day when the store sells more than usual, or an order that turns up late. The calculator offers two methods:

  • Peak usage and longest lead time: peak daily usage × longest lead time, minus average usage × average lead time. Your sales history and supplier invoices are enough to fill it in.
  • Target service level: the Z factor for the service level × the standard deviation of daily usage × the square root of lead time. A 95% service level means stock lasts through 95 order cycles out of 100.

SS = dmax × Lmax − d × L  ·  SS = Z × σd × √L

Example with both methods: average sales are 40 cartons and the peak is 55; lead time is 5 days and the longest has been 6. The first method gives 55 × 6 − 40 × 5 = 130 cartons. At a 95% service level with a standard deviation of 8 cartons, it is 1.645 × 8 × √5 = 29.43, or 30 cartons after rounding up.

The first method assumes the worst sales day and the worst delay happen together, so it gives the larger figure. If your supplier is sometimes late, advanced settings add a field for the standard deviation of lead time, which feeds into the second formula.

Economic order quantity (EOQ)

Economic order quantity is the order size at which what you pay each year to place orders equals what you pay to hold the stock, so their total is as low as it gets. Many small orders push up ordering cost; a few large ones push up storage cost and tie up cash.

EOQ = √(2 × D × S ÷ H)

Example: annual demand of 14,600 cartons, an ordering cost of SAR 150, and a holding cost of SAR 2.40 per carton per year. The economic order quantity is 1,351 cartons, about 10.8 orders a year, or one every 34 days. Annual ordering cost is SAR 1,621.02 and holding cost SAR 1,621.20, a total of SAR 3,242.22.

The formula assumes steady demand all year and a price that does not change with order size. If the supplier gives quantity discounts, or sales are seasonal, as they are in the Saudi market around Ramadan and back to school, work out each season separately. In restaurants, shelf life caps the quantity before the formula does: never order more than will be used before it spoils.

Common mistakes with reorder points and EOQ

  • Counting lead time from the day the supplier ships, when it should run from the day you place the order to the day the goods are in the warehouse and ready to sell. If the supplier is outside the Kingdom, add the days for sea freight and customs clearance.
  • Using an annual average for a seasonal item, so stock piles up after the season and runs out at its peak.
  • Leaving holding cost at zero or close to it, which produces a huge order quantity. Put rent, insurance, spoilage and the cost of tied-up cash into it.
  • Comparing the reorder point with stock on hand alone, when open orders that have not arrived count too.

What to do after the result

Write the reorder point and safety stock on the item card or on the shelf itself, and review them every quarter or whenever the supplier changes. To apply the calculation across your item list, download the result as an Excel file: it holds the same formulas in cells, so you copy the row for each item and change its numbers.

When items run into the hundreds

Working out one item takes a minute. With hundreds, daily usage shifts every week, lead times differ by supplier, and nobody checks stock against the reorder point every morning, so one item runs out while another piles up. At Microtec we offer retailers and wholesalers in Saudi Arabia an ERP accounting system covering purchasing, inventory, sales and finance, so each item's movements and its supplier sit in one place. Load the items that run out most often into the trial.

Frequently asked questions

How do I calculate the reorder point for stock?

Multiply average daily usage by the lead time in days, then add safety stock. An item selling 40 a day that arrives 5 days after ordering, with 60 units of safety stock, has a reorder point of 260 units.

What is the difference between safety stock and the reorder point?

Safety stock is a fixed buffer that should not be used up in normal conditions; the reorder point is the stock level at which you order, equal to usage during the lead time plus safety stock.

How do I calculate economic order quantity?

Multiply annual demand by the cost per order and by 2, divide by the holding cost per unit per year, and take the square root. With demand of 14,600 units, an ordering cost of SAR 150 and holding of SAR 2.40, the quantity is 1,351 units.

What service level should I use for safety stock?

Whoever owns the decision sets it by the cost of running out: items whose absence loses the customer justify 98% or 99%, while slow or perishable items can do with less. Each step up holds back more stock.

Can I download the inventory calculations in Excel?

Yes, from the Download Excel button. The file holds the inputs in cells with live formulas, so changing a number updates the result. The first download opens a short form asking for your name, email and mobile; the result on the page is always open.

↑